Commissioning and Decommissioning
Project Highlights
- Lead project resource requirements to plan and complete assigned tasks, including internal managers support, consultants, engineering, and field contractors.
- Drafted a business case for the SCADA pipeline system control process improvement.
- Generated documentation and rationalization (D&R), for a new pipeline alarm management software installation and for better SCADA system control optimization database analysis.
- Developed and revised standard and site-specific Gas Processing Pipeline Equipment Alarm Guides, such as DCS Hardware and pipeline analog points (pressure, temperature, flow rate etc.) that conform to Alarm Philosophy Guidelines and Gas Control Operation Procedures.